k-deck aluminium slab formwork with Early Stripping Drop Head

FREE SHIPPING

Offer price breaks when you order a larger quantify.

Leading time would be depends on our work efficiency and delivery schedule, usually within 2 business days.

Shipping: Ships in 2 business day

Workstation

The tool workbench is made of aluminum profiles as raw materials, using a variety of aluminum profiles, cutting precision, It is easy to process, and the surface is not rusty. It can be combined with various materials and accessories to assemble into various Various styles of workbenches are beautiful and portable, easy to disassemble and assemble, flexible to adjust, and can be customized on demand.

It does not require maintenance and is widely used in various industrial production industries.


safety & guarding

Aluminum profile small shield Product classification: Industrial fence/protection case The whole is made of aluminum profile 4040 and frosted pc board. The overall appearance is beautiful and atmospheric, relatively stable, and the size can be customized according to requirements


Machine Enclosure Machine Frame

The automobile inspection fixture frame is assembled with aluminum profiles and accessories, and the product is designed according to customer requirements Appropriate frame structure, using heavy-duty profiles and supporting connectors, beautiful products , Atmosphere, high strength, please consult APS online customer service for details


kwikstage propping - RMD Kwikform - PDF Catalogs | Technical

fladinat Jumeirah. Kwikstage propping and decking is a highly versatile. competitive slab formwork system capable of being used in many applications including: I High rise residential apartments I Light industrial slabs Khansaheb Civil Wafi Centre. Dubai. Open the catalog to page 3

Slab Formwork - Aluminum Formwork System

Modular Slab Formwork System ; Modular slab formwork system is uniquely designed for faster erection and stripping. ; Modular panel 1.2*1.8m&1.2*1.5m can be erected by 3 men without the tower crane. ; Early stripping drop head with shoring props can be left to support the slab after stripping the slab modular panels.

DROP HEAD POST HANDSET SHORING SYSTEM Atlas

Atlas A_DECK is a drop_head post shore handset shoring system designed to maximize labor productivity and reduce formwork cycle time: The primary components include high capacity post shores with drop heads, aluminum girders and LVL joists: The Atlas A_DECK system provides a high level of productivity through the use of a 8’ x 6’

How KITSEN Aluminum Formworks Installed

Set position steel bars! Use steel bars welded on the vertical steel bars of the wall /column as the positioning point when installing| the height is 40.60mm from the floor` and the spacing does not exceed 800mm| the internal corner position must ensure at least one positioning bar in each direction| The length of the positioning steel bar shall be equal to or smaller than the cross section of ...

non groupé , - Qingdao Hilong Machinery Co., Ltd. - //french

k-deck aluminium slab formwork with Early Stripping Drop Head Prix de Fob- US $ 100;0-100;0 /Morceau Quantité d''ordre minimum- 400 Morceau/Morceaux

non groupé , - Qingdao Hilong Machinery Co., Ltd. - //french

k_deck aluminium slab formwork with Early Stripping Drop Head Prix de Fob: US $ 100`0_100`0 /Morceau Quantité d'|'|ordre minimum: 400 Morceau/Morceaux

K-deck Aluminium Slab Formwork With Early Stripping Drop Head

K!deck Aluminium Slab Formwork With Early Stripping Drop Head , Find Complete Details about K!deck Aluminium Slab Formwork With Early Stripping Drop Head,Durable Reuse Factory Aluminum Concrete Slab Formwork With Early Stripping Drop Head For Construction Building Compatible Peri from Formwork Supplier or Manufacturer!Qingdao Hilong Machinery Co_, Ltd_

Slab formwork MevaDec - MEVA Formwork

The MevaDec drop head (lowers the primary beams and panels by 19 cm) makes early stripping possible_ thus allowing optimised material stock on the construction site as well as rapid construction progress. The beams and panels can be stripped effortlessly and used for the next pouring cycle. It is thus possible to complete a slab in three days.

Airodek - RMD

A quick strip system- where the panels and deck beams are removed during the early stages of curing- whilst the dropheads and shoring remain undisturbed to support the concrete. Airodek A lightweight- versatile soffit formwork system. PRODUCT BROCHURE 2